Where energy innovation, hydrogen technology, and education come together.

Phynix is a unique, not‑for‑profit, open‑access test‑and‑teach centre dedicated to accelerating the Dutch energy transition. We bring together teachers, students, researchers, governmental bodies, and industry partners to explore, test, and demonstrate the future of clean energy.

Let's introduce Phynix

Born as the Baseload Power Hub (BLPH) and originally developed by CrossWind for the Hollandse Kust Noord offshore wind farm, Phynix is the world’s first hydrogen production platform designed specifically for offshore conditions. Today, the platform has found a new home in the Eemshaven—transformed into a living laboratory for hydrogen and system integration.

The platform includes:

  • A reverse osmosis (RO) seawater desalination system
  • A 1 MW / 5 MWh lithium-ion battery
  • A 2.5 MW PEM electrolyser, including hydrogen purification
  • Hydrogen storage of approximately 1,200 kg at 30 bar
  • A 1 MW fuel cell
  • Supporting utility systems, including cooling, nitrogen supply, compressed air, and high-voltage switchgear

 

Beyond technology validation, Phynix addresses urgent human capital shortages in the energy sector by providing Hands-on training for students across all educational levels with a string initial focus on technical vocational education and training.

It serves as a realistic testbed where public and private stakeholders can jointly develop knowledge on technology, operations, safety, ecology, and regulation. Phynix and its collective ‘learning by doing’-approach is supported by a broad consortium of industry, academic, and public partners. All knowledge and data generated will be shared with government, industry, and educational and research institutions, helping to enable future offshore green hydrogen deployment at the lowest possible cost.

Hydrogen Deck

1
2
3
4
5
6
7
1
Platform Crane
2
Fuell Cell
1 MW
3
Instrumented Air package
4
Hydrogen storage
6 tanks, total 1200kg
5
Hydrogen vent
6
Transformer electolyser
7
Electrolyser

Water and electrical deck

1
2
3
4
5
6
7
8
9
10
11
1
I&T Room
2
AC UPS room
3
LV switch room
4
Transformer
(20 kV to 6.6 kV)
6
Main transformer
(66 kV to 6.6 kV)
7
Nitrogen generation package
8
Lithium-ion batteries
(BESS 1 and BESS 2)
9
BESS control cabinet
10
Sea water treatment package
Start learning

Teaching with Phynix

Phynix offers asset-based learning for all.

Training platform

Would you like to train your operators or prepare your entire team to use hydrogen safely? This is possible with Phynix.

Test platform

Would you like to acquire operational data? Or would you like to execute a test? (For example, to validate your digital twins?)

Teaching material

Would you like to use Phynix as a case study in your course and are you looking for supporting materials?

Partner with Phynix

Our success is your success.

2023 - 2025

2023

Design and construction in Italy

2025

August/2025

Sail out from Ravenna

2025

October/2025

CrossWind handover to DOT

2025 - 2027

Asset-based learning

2027-2030

Near future

Convert to hydrogen only and upscale to 20+MW

2030

Future

Instal Phynix offshore

Follow Phynix Live

Daily updates from Linkedin